Completed projects are our best business card

In progress

Construction of the Museum of Underwater Archaeology and Baltic Fisheries in Leba

Comprehensive construction of a museum facility. The building has a volume of more than 46 thousand cubic meters and a u …

Details

Reconstruction and adaptation of the Villa Musica building along with adjacent land in Wejherowo

Comprehensive reconstruction and revitalization including conservation work and landscaping. The realization won the thi …

Details

Emergency helicopter landing pad on hospital in Gdansk

Construction of a reinforced concrete elevated helipad at the hospital in the center of Gdansk.

Details

Construction of a transhipment and storage yard

Construction of a loading and storage yard with an area of over 40,000m2 and a length of over 1.2km. Reconstruction of …

Details

Adaptation of the historic Old Pharmacy powder magazine building for the new stage of the Wybrzeże Theatre in Gdańsk

Construction work of the historic 17th century Old Pharmacy building. Construction of a gantry passageway and connector …

Details

Plate for assembly and launching of hulls in Gdańsk

Construction of the mounting slab – the slab surface is made of concrete technology, placed on piles. Electrical, sanita …

Details

Comprehensive reconstruction of Dom Zdrojowy in Gdańsk

Comprehensive execution of construction works with special emphasis on conservation works – structural works, finishing …

Details

Construction of a warehouse with social and office facilities along with the necessary technical infrastructure

Construction of a warehouse and component hall with social and office facilities and parking, access roads, external net …

Details

Transport by land of 370-ton submarine

Route preparation and overland transport of the 370-ton Kobben-type submarine ORP Sokol. The 47.4m long and 4.6m wide sh …

Details

Restoration of the stability of the historic Granary in Gdańsk

Restoring the stability of the granary by strengthening the foundation. Repair and maintenance of historic brick walls. …

Details

Reconstruction of the Malarnia Stage building along with the construction of stage mechanics

Reconstruction of the Malarnia Stage building, including stage mechanics.

Details

Repairing the landslide and strengthening the railway embankment.

Repairing the landslide and strengthening the railway embankment.

Details

Reconstruction of Tczew Railway Station

Comprehensive reconstruction of the railway station while maintaining the continuity of the station’s operation. …

Details

Restoration of the church and rectory in Sopot

Restaurant of the church and rectory. Development of multi-sectoral design documentation, strengthening of the structure …

Details

Development of the attic in the historic St. John’s Church in Gdansk.

Construction, maintenance, attic development.

Details
In progress

Construction of a storage hall

Construction of a storage hall with landscaping.

Details
In progress

Construction of two storage halls in Miszewko

Construction of a warehouse and storage hall with social and office facilities, as well as a parking lot, access roads, …

Details
In progress

Change of use of the former hospital complex

Comprehensive reconstruction of the buildings of the post-hospital complex with a change of use for exhibition, accommod …

Details

The replacement of the roofing in the historic buildings of the Academy of Music in Gdansk

Replacement of roofing in two buildings of the Academy of Music in Gdansk with a total area of more than 3,500 m2, toget …

Details
In progress

Execution of construction works under the task entitled “Restoration of the value of the 17th century Orphanage Complex in Gdansk”

The restoration of the value of the 17th century Orphanage includes tasks such as strengthening the foundation structure …

Details

Modernization of drainage facilities

Modernization of drainage facilities on an area of about 2,000 hectares.

Details

Reconstruction of the industrial quay in the design and build formula

Reconstruction of the industrial quay in the design and build formula

Details

Construction of a storage yard with an area of more than 10,000m2 and construction of an open retention tank

Construction of a storage yard with an area of more than 10,000m2 and construction of an open retention tank. …

Details

Execution of comprehensive earthworks, soil stabilization and road layout with parking lots

Execution of earthworks and soil stabilization. Comprehensive execution of road works.

Details

Bridge facilities as part of the modernization of railroad line 226 to the Port of Gdansk North

The investment included the following. Repair and modernization of the railroad viaduct over the E65 railroad line; Cons …

Details

Construction of a railroad bridge over the Radunia River

Demolition of the existing bridge including reinforced concrete supports. Construction of a new three-span bridge with a …

Details

Comprehensive development of an area of 30,772 m2 around the AMBER EXPO Center

Comprehensive execution of land development of 30,772 sqm around the AMBER EXPO Center – construction of pedestrian rout …

Details

Construction of a road layout near the Agata Meble furniture store in Rumia

Comprehensive execution of earth and road works.

Details

Construction of an internal road system

Construction of the internal road system. Construction of roads, sidewalks, underground utilities, retention reservoirs. …

Details

Design and reinforcement of railroad embankment, Railroad Line No. 009 Warsaw – Gdansk,

Design and construction of railroad embankment reinforcement in specific locations of railroad line No. 9 (E65) while ma …

Details

Demolition and reconstruction of the railroad embankment

Demolition and reconstruction of the railway embankment

Details

Earthmoving and construction works related to the construction of a reinforced concrete ash tank

Construction of an ash tank.

Details

Construction of a Recreation and Sports Center in the ground floor of the stadium under the design and build formula

Construction of a Recreation and Sports Center in the ground floor of the stadium under the design and build formula …

Details

Construction of water tram stops

Construction of the Wisłoujście and Westerplatte water tram stops.

Details

Ponad 270 projektów zrealizowanych od 1995 roku